
ARCHITECTURE
STRUCTURAL ENGINEERING
BUILDING SERVICES ENGINEERING
CONSTRUCTION MANAGEMENT
FEATURED PROJECTS

2013
Donita 3 building complex is located at the entrance of Peja town and it has direct access to the main M-9 road which leads to Prishtina. In terms of design, it can be seen that the clear geometric forms give the building the architectural quality and simplicity ...

2007
Donita 1 is the first building complex that adopted the new era of architectural design in the town of Peja containing the box-shaped cantilevers that underlined the precedence of cubist and minimalist design. In the future, the building was then extended with Donita 2 in the North Elevation ...

2015
Suna Sport is one of the newest shop projects that was designed at our office, hence it contains new styles and materials which were applied to expose a clear vision of the client's requirement. Its sporty function, the business case, the spider glass, the dark colour and the pointy lines make the building look glamorous and shiny ...
OUR STEPS TO MAKING YOUR WISH COME TRUE
01
02
03
Concept Design
Technical Design
Construction
We provide you with an architectural plan that sets out your demand to be then checked with the local authorities. This stage is made to give ideas and proposals for the use of the building.
After the proposal is chosen and checked from the local authorities we then prepare detailed project documents containing building information for the architecture, structure, pipework and electrics.
In the last stage we usually meet the main contractor and the subcontractors to plan the construction of the building. We then monitor the whole construction process in a periodical matter.